The Equipment tab contains the equipment details and its related maintenance activities to be performed such as service period, part replacement, refurbishment due, and so on.
-
Click the Equipment tab.
-
Select Include Equipment to include the equipment in the Investment Plan.
If the Include Equipment check-box is deselected for an equipment, it will not appear in the Investment Plan Results. Also, in Scenario Investment Plans, Investment Plan Locked for Editing gets selected.
-
Type the Priority Override.
The Priority Override value gets reflected in the Planning Result Settings > Investment Plan Equipment Settings panel only for the selected equipment that are to be included.You must set a valid value for the Priority Override rather than leaving it blank, which changes it to 0.
-
Click SAVE.