The Equipment tab contains the equipment details and its related maintenance activities to be performed such as service period, part replacement, refurbishment due, and so on.

  1. Click the Equipment tab.

  2. Select Include Equipment to include the equipment in the Investment Plan.

    If the Include Equipment check-box is deselected for an equipment, it will not appear in the Investment Plan Results. Also, in Scenario Investment Plans, Investment Plan Locked for Editing gets selected.

  3. Type the Priority Override.

    The Priority Override value gets reflected in the Planning Result Settings > Investment Plan Equipment Settings panel only for the selected equipment that are to be included.You must set a valid value for the Priority Override rather than leaving it blank, which changes it to 0.

  4. Click SAVE.