Integration with EcoSys Scheduling - EcoSys - 2.0 - Help - Hexagon

EcoSys P6 Connector Help

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Version
2.0

As of EcoSys version 8.8, EcoSys has its own Scheduling module. EcoSys Scheduling offers basic scheduling capabilities, including Critical Path Methodology, relationships, and resource management.

The P6 Connector R2 offers integration between Primavera P6 and EcoSys Scheduling. This allows Cost Control users within EcoSys to view P6 schedules without logging into P6.