Testing the P6 API within EcoSys - EcoSys - Installation & Upgrade - Hexagon PPM

EcoSys Primavera P6 Adapter Installation

Language
English
Product
EcoSys
Search by Category
Installation & Upgrade
EcoSys Version
8.8
  1. Log in to EcoSys, and click System Information.

  2. Click the Integration tab, and then select Test Primavera Connection.

    The status should display similar to the screenshot below.