Tomcat and P6 Integration with EcoSys - EcoSys - Installation & Upgrade - Hexagon

EcoSys Primavera P6 Adapter Installation

ft:locale
en-US
Product
EcoSys
Search by Category
Installation & Upgrade
EcoSys Version
9.3
  1. Stop the Tomcat service.

  2. Navigate to the C:\Program Files\Apache Software Foundation\Tomcat 8.5\lib folder, and delete the file intgserver-wrapper.jar.

  3. Copy all of the Primavera API .jar files from the P6 Integration API \lib directory to the C:\Program Files\Apache Software Foundation\Tomcat 8.5\lib folder.

  4. Start the Tomcat service.

  5. Skip to the section Testing the P6 API within EcoSys.