Follow the procedure below to update the project structure attributes.
-
In the Estimate Structure Details panel, click the GENERAL tab.
-
If required, edit the Object Name.
-
Click the ellipsis for each of the below boxes and select the required values.
-
Type - Select a project type.
-
(Optional) Responsible Manager - Select a responsible manager.
-
-
(Optional) Type the required Objective.
-
Click SAVE.