Follow the procedure below to setup a Schedule WBS Activity.

  1. Navigate to Scheduling > Project Schedules.

  2. In the Project Schedule Register panel, select the required Project ID hyperlink against the Schedule WBS Activity scheduler method.

  3. In the Project Schedule Register panel, do the following:

    1. (Optional) In the toolbar, click the Project Controller ellipsis to select the project controller.

      All the projects that are controlled by the selected project controller are displayed.

    2. (Optional) In the toolbar, click the Project Manager ellipsis to select the project manager of the project.

    3. (Optional) In the toolbar, click the Portfolio ellipsis to select the portfolio to which the project belongs to.

    4. Select the required Project ID hyperlink against the Schedule WBS Activity scheduler method to view and edit its project details.

      The project details are displayed on the right-hand side.

  4. (Optional) To change the project within the same scheduler method, in the Schedule WBS panel, at the top of the screen, in the toolbar, click the Project ellipsis and select the required project.

  5. If required, click Refresh icon to update the screen.