This procedure allows you to view and unassign the Changes assigned to a Risk.
-
In the Project Risk Details Tabs panel, click the RELATED RISK CHANGES tab.
-
By default, the last selected risk appears in the Risk ellipsis. To change the risk, click the Risk ellipsis in the toolbar and select the required risk.
-
You can customize the view of the Related Changes panel from View Settings.
-
-
To unassign the Change, click its respective Disconnect hyperlink.
Risks can only be Disconnected if the Change Status is not in a Submitted or Approved State.