View and Unassign Project Risk Related Changes - EcoSys - 4.11 - Help - Hexagon

EcoSys Projects Help (4.11)

Language
English
Product
EcoSys
Subproduct
Project
Search by Category
Help
EcoSys Standard Version
4.11

This procedure allows you to view and unassign the Changes assigned to a Risk.

  1. In the Project Risk Details Tabs panel, click the RELATED RISK CHANGES tab.

    • By default, the last selected risk appears in the Risk ellipsis. To change the risk, click the Risk ellipsis in the toolbar and select the required risk.

    • You can customize the view of the Related Changes panel from View Settings.

  2. To unassign the Change, click its respective Disconnect hyperlink.

    Risks can only be Disconnected if the Change Status is not in a Submitted or Approved State.