Configuring External Operations - EcoSys - Help - Hexagon

EcoSys SAP Adapter Help

Language
English
Product
EcoSys
Search by Category
Help
EcoSys Version
9.1
  1. Navigate to Integration > Operations. From there, under the defined external system for your SAP connection, you can create an individual operation.

  2. Select the operation type for each operation, and then configure the specific parameters for that operation. The example shows the parameters that have been configured for Import Actuals.

    You may define multiple operations of the same type but with different parameters.

  3. Click the Run link on the General tab to run the operation.

  • You can view operation status and results in the Reports > Batch Job Log screen. Additional detail on the status of each event is logged to the application log.

  • For troubleshooting SAP messages, you can also refer to the pluginsap.log file.