The estimator then creates a CU estimate associated to the project, with the following details:
Field |
Value |
---|---|
Description: |
Install Pole Assembly at Work Point 1. |
Associated Capital Project: |
CU Design Project 01252021 |
Estimate Type: |
Design This indicates that the estimate will be used to estimate costs; and to generate work order activities on the work order associated to the project. |
Work Point(s): |
One (1) - labelled as "Work Point 1". |
Compatible Units: |
At Work Point 1, perform an Install of one (1) CU_LB-01 (Assembly). |
When the estimator is satisfied that the details of the CU estimate accurately reflect the scenario, he selects the Perform Estimation button to generate cost details specific to the estimate.