Adding events to campaigns - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

A campaign event is either a survey of equipment on the specified campaign to check for equipment repairs needed, or a job to perform to repair equipment. If a piece of equipment passes the survey event, work is not necessary. If a piece of equipment fails the survey, a job event is performed to repair the equipment. A campaign can have only one survey event, but several job events.

Add, change, or delete campaign events as necessary.

To add events to campaigns:

  1. Select Work > Projects > Campaigns.

  2. Select a campaign, and then click the Campaign Events tab.

  3. Click Add Campaign Event.

  4. Specify this information:

    Campaign Event - Enter the order in which this campaign event will occur.

    Project-Budget - Enter both the project and budget to associate to this campaign event.

    Standard WO - Enter the standard work order to associate to this campaign event.

    Assigned To - Enter the person responsible for the work order.

    Assigned By - Enter the supervisor who assigned the work order.

    Requested By - Enter the person who requested the work.

    Survey - Select to mark this campaign event as an equipment survey type.

    Production Priority - Enter the priority for the production. The system automatically populates Production Priority Desc.

    Req. Start Date Buff. (Days) - Enter the number of days needed prior to the starting date for the work order.

    Req. End Date Buff. (Days) - Enter the number of days needed after the ending date for the work order.

    Downtime (Hours) - Enter the number of hours that the equipment was out of operation due to failure.

    WO Description - Enter a description of the work to be performed for the campaign event.

    WO Type - Select the type for the work order.

    Priority - Enter the priority of the work order for the campaign event.

    WO Class - Enter the work order class for the campaign event. The system automatically populates WO Class Org.

    Duration - Enter a duration (time) for the work order for the campaign event.

    Problem Code - Enter the code to identify the type of problem.

    Safety - Select if this campaign event requires special safety precautions.

    Trade - Enter the trade required to perform the activity.

    Task - Enter the task code for the activity.

    Material List - Enter the material list code for the material list containing the parts needed for the work order.

    Estimated Hours - Enter the estimated number of hours required to complete the activity.

    People Required - Enter the number of people required to perform the activity.

    Activity Duration - Enter a duration (time) for the activity for the campaigning event.

  5. Click Submit.