Designate which isolation point fields, tabs, and link buttons will be protected when isolation point revision is not Unfinished.
To set up revision control for isolation points:
-
Select Work > Revision Control > Revision Control Setup.
-
Click the Isolation Points tab.
-
Specify this information:
Protect - Select to protect the field on the Isolation Points form and all isolation point-related tabs.
-
Click Save Record.