RCM potential yearly savings - HxGN EAM - 12.0.1 - Help - Hexagon

HxGN EAM Help

Language
English
Product
HxGN EAM
Search by Category
Help
HxGN EAM Version
12.0.1

Description

This report displays equipment or non-critical assets up to a certain risk level with PM and maintenance pattern cost information attached. The costs are converted to an annual budget and provide data on potential savings in the case where preventive maintenance is not performed on non-critical assets.

Only assets with the maximum risk level or lower threshold risk levels are selected and displayed.

Menu Path

Work > Reports > RCM > RCM Potential Yearly Savings

Parameters

Specify the Organization, RCM Project, Maximum Risk Level, and Equipment.

Years Included in Avg. - Specify the number of years to include in the average costs per PM or maintenance pattern.

Include Children - Select to include the children of the selected equipment in the report.

Report Type

Basic