Work Order screen enhancements - HxGN EAM - 12.0.1 - Mobile - Hexagon

HxGN EAM Mobile Apps Release Notes for 12.0.1

Language
English
Product
HxGN EAM
Search by Category
Mobile
HxGN EAM Version
12.0.1

Proof of delivery sign off mechanism

A new action item has been exclusively added to digital work, on the work order record view called ‘Proof of delivery’:

  • Touching this button will run the proof of delivery report, and passes the work order number as the required report parameter

  • This report will have a ‘Signature’ button on the top right – upon touching this will open the signature capture mechanism.

    • The signature is captured in the last page of the report, right above the ‘Customer Signature’ area of the report.

  • After saving this signature, the report will close and return to the work order form and give a success message.

  • This report will be stored/uploaded as a document on the Work Order > Documents form.

A new document will be uploaded, every time the user performs this action – i.e., Running the report – Capturing a signature – Saving the report.

Honor setting of MOBACTCL

Digital work will now honor the settings of the existing install parameter MOBACTCL which controls the custom colors for the activity tab (depending on the timer star – stop - completion):

  • If the activity is not started at all, or if started, but NOT stopped (i.e., timer is running) - then its color code is ‘Not Started’

  • If the activity has been stopped, but is NOT completed - then the color code is ‘Started’

  • If the ‘Completed’ checkbox is checked, then its color code is ‘Completed’

  • If this install parameter is empty - the icons do not show

  • If this install parameter has invalid values or a combination of valid/invalid values – then the predefined colors as part of the install parameter description will show in place of ‘invalid’ values