Entering meter readings - HxGN EAM - 12.0.1 - Mobile

HxGN EAM Mobile User

Language
English
Product
HxGN EAM
Search by Category
Mobile
HxGN EAM Version
12.0.1

If you take action upon equipment identified as a Safety piece of equipment, the system shows a confirmation message asking whether you wish to continue.

  1. Select Equip > Meter Reading.

    The Equip lookup shows all equipment records that have meters attached and that are in the organizations for which you have access permission.

  2. Specify this information:

    Equip - Specify the equipment for which to enter meter readings.

    UOM or Meter - Specify either the unit of measure or the physical meter code.

    Date - Specify the date of the meter reading.

  3. Choose one of the following options:

    Option

    Description

    Read

    Specify the current meter reading.

    Diff

    Specify the difference between the last reading and the current reading.

  4. Click Save.

  5. Click Yes.