The RCM Risk Levels report shows all equipment that has an associated Risk Assessment, Risk Analysis, or FMECA. Important report parameters:
-
Organization - Leave blank for all. Supports wildcards if ‘Include Children’ is not checked.
-
RCM Project - Enter the RCM Project.
-
Equipment - Leave blank for all. Supports wildcards if "Include Children" is not checked.
-
Risk Level - Leave blank for all. If you select a value the system will only include equipment with the same Risk Level or higher. Higher here means the Rating/Threshold of the included Risk Levels is the same or higher than that of the selected Risk Level.
-
RCM Level - Set to include equipment with a Risk Assessments, with a Risk Analysis, or with both.
-
Include Children - The report will include the children of the select Equipment. For example, if you report on a production line all assessments and analysis from children will be included.
-
Include Functions - The report will list the Functions of the included equipment.
-
Include Failure Modes - The report will list the Failure Modes of the included equipment.