EAM-51157 CLONE - PM Forecasting | Forecasting - PM setup with two objects, but in forecast only one line is shown - HxGN EAM - Version 12.0 - Hexagon

HxGN EAM Resolved Issues for 2022

Language
English
Product
HxGN EAM
Search by Category
HxGN EAM Version
12

EAM-51157 CLONE - PM Forecasting | Forecasting - PM setup with two objects, but in forecast only one line is shown

 Description 

PM is setup with two objects (the same object), but two different periods.

When opening a PM forecast session, only one line is shown.

*Steps to reproduce*

1. In work - wo planning - pm schedule, create one PM schedule for duplicate type

2. Add actvitiy and two lines of the same object:

-One for period every week,

-One for period every day

3. Go to work - wo planning - pm forecast

4. Select equipment used in the PM

5. Set minimum periodicity to 1 (under generate options)

6. In Preview tab select equipment

7. In Forecasting see that there is only one line.

Please check out session PM forecast session 10002 in below URL.

*Expected result*

We expect to see two lines as two equipment records have been added to PM.

It only shows the second line from the PM - equipment tab.

*Actual result*

In Forecasting there is only one line.

EAM-51448 MP0024_GetWorkOrder_001 - WO can be retrieved even if not the same ORG with user