The value specified in the Suggested due date box is set as the workflow step response date. If no value is specified, then it is calculated as given below:

Online transmittals

  • The due date is calculated based on the Outgoing transmittal default response days value provided on the contract.

  • If the default response day property is empty, the response days value equals the current date.

Offline transmittals

If a contract is selected:

  • The due date is calculated based on the Outgoing transmittal default response days value provided on the contract.

  • If the default response day property is empty, the response days value equals the current date.

If a contract is not selected:

  • The response days value equals the current date.

SHARED Tip For example, if the default response days is 10, the system adds 10 working days to the current date and sets the result as the due date.