If your Smart Build Insight project is integrated with a planning tool such as Primavera P6 EPPM, do not use the Import/Export feature to share data between the two tools. Doing so can destroy data in one or both systems, and you might not be able to recover it!
-
On the left bar, click Administrator Settings > Export or import data.
-
Click the Export tab.
-
Choose the required export definition and the name of the project you want to export data from.
-
Type a name for the file.
-
Click Export.
When the file is ready, you'll get a notification.
-
Click Notification .
-
In the Notification panel, locate the notification and click Download.