Admin Utility Differences When Using Multiple Project Databases - PAS ICS Integrity - 7.3 - Help - Intergraph

ICS Integrity Help

Language
English
Product
PAS ICS Integrity
Subproduct
ICS
Search by Category
Help
PAS Version
7.3

In project mode, all links on the Admin Utility window work the same as described except the following links:

  • Database - When working with multiple project databases, database names must begin with a letter or underscore, and they can contain only letters, numbers, underscores, and periods. No special characters or dashes can be used. Spaces in database names are replaced with underscores. For example, if you type Production Database for the database name, the created database is named Production_Database.

    When you change from one database to another, you need to stop and restart the PAS WebFileService service.

  • Virtual Directory - When working with multiple project databases, the virtual directory names for the Integrity web interface match the database names and cannot be edited. The fields on this window are disabled.

  • Import Asset Models - When you select an asset model to load (import) and click the Import button, Integrity loads the asset model into all projects.

  • Maintain Projects - In project mode, this additional link is available in the Admin Utility. Click this link to view and maintain all projects in Integrity.

In addition, users can connect only to existing databases (not create them), so the link called Database for an administrator is called Configure Database for users. After an administrator creates a database (project), the user can connect to the project by clicking the Configure Database link, and then manage the assets within the project.