Ignore Task Properties - Integration - Update 44 - Help - Hexagon

Integration Help

Language
English
Product
Integration
Search by Category
Help
Smart 3D Version
12.1 (2019)
Smart Construction Version
2019(7.0)
SmartPlant Foundation / SDx Version
10
Smart Electrical Version
2019 (9.0)
Smart Materials/Smart Reference Data Version
2020 (10.0)
Smart P&ID Version
9 (2019)
Smart Review Version
2020 (15.0)
Smart Engineering Manager Version
10 (2019)
Smart Interop Publisher Version
13.1 (2019 R1)
Smart Isometrics Version
7.0(2019)
Spoolgen Version
9.0(2019)
  1. Select SmartPlant > To Do List.

  2. On the To Do List dialog, select a Create or Update task for which you want to ignore properties.

  3. On the toolbar, select Properties PPM All Outputs Graphic.

    SHARED Tip You can also open the Task Properties dialog by double-clicking a task in the To Do List.

  4. On the Task Properties dialog, select the Details tab.

  5. Select the Ignore check box beside each property that you want the software to ignore when running the task.

    SHARED Tip When you select to ignore a property, the software does not update that property when you run the task for the current or for subsequent retrieve sessions. If the new value of the property changes in the published data, on the next retrieve, that property is no longer ignored. If you want to ignore the property only for the current retrieve session, clear both the Activate and Ignore check boxes beside the property.

After running a task that includes ignored properties, that task is copied from the To Do List to the ignored tasks list, where only the properties that were selected to be ignored appear on the Details tab.