The high-level list below presents the basic tasks required to install and configure Smart Electrical. For more details, see the Smart Electrical Installation and Upgrade Guide.
-
Install database client software or verify that the installed client software is compatible with Smart Engineering Manager database server recommendations
-
Install prerequisite software on the server
-
Install Electrical Reference Data
Smart Engineering Manager
-
Install database client software or verify that the installed client software is compatible with Smart Engineering Manager database server recommendations
-
Install prerequisite software on Smart Engineering Manager workstation
-
Install Smart Engineering Manager software
-
Choose a domain or local administrator group to be selected during site creation as the Smart Engineering Manager Administrator group
-
Create and configure the site and plant
Smart Electrical
-
Install database client software or verify that installed software is compatible with Smart Electrical workstation recommendations
-
Install prerequisite software on the Smart Electrical workstation
-
Install SmartPlant License Manager Version 2008
-
Install Smart Electrical software