-
Click the Grid View Command in the ribbon.
-
In the tree view, click Conduit > Commodity Material Control Data (Catalog Engineering Checks\Conduit).
-
Click the Insert Row Command to insert a blank row in the grid view.
-
In the Industry Commodity Code column, type the industry commodity code.
-
In the Contractor Commodity Code column, type the contractor commodity code.
-
Specify values for the remaining properties as required.
-
Click the Save Command .