Message
Run without specification.
Severity
Normal.
Detailed Description
All runs (pipe/duct/conduit/cableway) must have a specification associated to them. Because the specification dictates the part selection (rule defined), it is very important that a run has a relation to a specification.
Possible Cause
After creating runs in the Model database, you may have deleted the specifications in the catalog. Run the Synchronize Model with Catalog command in the Project Management task, and then the runs are added to the To Do List.
Possible Impacts
You will not be able to modify such runs. Attempting to modify such runs will result in To Do records. The solver will create To Do records for the run or features based on the type of modification.
What You Should Do
Select the run and choose a new specification for the run. Or, delete the run.