Phase Three: Complete the Disconnected As-Built Project - Intergraph Smart 3D - Administration & Configuration - Hexagon

Intergraph Smart 3D Integration - Project As-Built with HxGN SDx

Language
English
Product
Intergraph Smart 3D
Subproduct
Project As-Built with SDx
Search by Category
Administration & Configuration
Smart 3D Version
13.1

In this phase, the O/O initiates the final tasks for completing the disconnected As-Built project. The O/O begins by restoring the external EPC Change Management model from backup and conducting a thorough design review of all the project additions and modifications. After completing the review, the O/O launches the synchronization to SDx operation. If the synchronize to SDx process fails for a design object, the O/O must resolve the error where possible. When all design changes are successfully synchronized to SDx, the O/O can then set the status of all related change actions to Design Review and release any claimed objects so that another project can claim them.

Descriptions of common error conditions and recommended resolutions are listed in Appendix: Share/Synchronize Error and Warning Conditions.

What do you want to do?