Consolidate the Global Workshare Configuration - Intergraph Smart 3D - Installation & Upgrade

Intergraph Smart 3D Upgrade Guide

Language
English
Product
Intergraph Smart 3D
Subproduct
Upgrade Guide
Search by Category
Installation & Upgrade
Smart 3D Version
13.1

All Cases A, B, C, and D

  • For Global Workshare configurations, upgrade from 2018, 2019, or 13 to 13.1 requires a consolidation of databases. The upgrade process is performed from the Host location after consolidation of the databases.

    1. At the Host location, use the 2018, 2019, or 13 client workstation that has the Project Management component installed to consolidate the Smart 3D configuration.

    2. After consolidation, check that all permission groups belong to the Host location.

  • For assistance with these steps, refer to Consolidate Model from Workshare Command in Global Workshare Oracle or Global Workshare SQL Server.