Meaning: The selected parent system is either inappropriate, or you do not have permission to place the equipment or design equipment under that parent system.
Recovery: Select an appropriate parent system that has an Approval State of Working and to which you have write permission.
Parent systems appropriate for equipment or design equipment:
-
Area System
-
Conduit System
-
Ducting System
-
Electrical System
-
Equipment Foundation
-
Equipment System
-
Generic System
-
Piping System
-
Structural System
-
Unit System