Piping Commodity Override Option - Intergraph Smart 3D - Help - Hexagon PPM

Intergraph Smart 3Dx Property Descriptions

Language
English
Product
Intergraph Smart 3D
Subproduct
3Dx
Search by Category
Help
Smart 3D Version
13

Specifies whether you want to disable, enable with no justification required, or enable with justification required the ability of a piping designer to override the piping materials class to select a piping commodity manually.

This setting overrides the piping commodity override option setting on the Model Options node for this piping material class.