You can view materials information for an IWP in Smart Construction based on drawings and components added to the IWP. A materials status request for an IWP provides details of the availability, status, and location of needed materials for an IWP.
Since materials in the Material system are managed with a Bill of Materials (BOM), you will be able to perform material status request for the BOM lists as a single entity from the Materials tab. A bill of materials (BOM) is a complete list of all the components and assemblies required for construction, as well as the quantities of each available in the Material system.