You can create an IWP based on another IWP by copying it.
-
Open an IWP.
-
Click Copy on the Overview tab.
-
Fill out details for the IWP.
-
Click Next, and then select the information you want to copy to the new IWP from the Options tab or a custom tab.
Tab |
What is added to the new IWP |
---|---|
Package Details |
Copies the scope and notes, files, and snapshots from the original IWP to the new IWP. |
Scope/Notes |
The scope and notes from the original IWP are copied to the new IWP. |
Files |
All files are copied to the new IWP, along with the preference of whether the file is included in reports. If files are configured to automatically attach to IWPs, the files are automatically added to the new IWP, based on how the files were configured. |
Snapshots |
All snapshots in the original IWP are added to the new IWP, along with any markups available on the snapshot. |
Planning Data |
Copies the construction responsibility and assigned user, components, and drawings from the original IWP to the new one. |
Assignments |
The construction responsibility and assigned user are copied from the original IWP to the new IWP. |
Components |
All components and drawings in the original IWP are added to the new IWP. Smart Construction validates the addition of components. For more information, see Resolve issues found while adding components. Only unplanned engineered work steps are added to the new IWP. Manually added work steps and SIDs are not added to the new IWP. |
Drawings |
All drawings in the original IWP are added to the new IWP. |
For information on how to configure the Copy option on IWPs, see Update Smart Construction interface items.