Load the work package enumerated list schema - Intergraph Smart Construction - 2019 (7.0) - Installation & Upgrade - Hexagon PPM

Intergraph Smart Construction Installation and Upgrade (2019)

Language
English
Product
Intergraph Smart Construction
Search by Category
Installation & Upgrade
Smart Construction Version
2019(7.0)

After loading the PBS schema, you can load the package enumerated list schema, which loads the enumerated lists for the delivered package disciplines, purposes, and statuses (related to CWAs, CWPs, and IWPs), as well as a list of blockage issues that can be used in the Smart Construction OnSite mobile app.

If you choose to not load the delivered package enumerated list schema, you must configure your own disciplines, purposes, and statuses. For more information, see Configure Work Package Disciplines and Purposes, and Configure IWP Status. For systems with Smart Construction OnSite, you must also configure your own blockage issues list. For more information, see Configure blockages for Smart Construction OnSite.

For more information on loading the work package enumerated list schema, see Load the work package enumerated list schema.