Rescope and Synchronize Updated As-Built Data - Intergraph Smart Electrical - Help - Hexagon

Intergraph Smart Electrical Help

Language
English
Product
Intergraph Smart Electrical
Search by Category
Help
Smart Electrical Version
10
  1. In Smart Electrical, re-scope the required items to the host project.

    After you have created an initial package, you cannot de-scope items in the As-Built.

  2. Close Smart Electrical.

  3. Open Smart Engineering Manager and connect to the host.

  4. Select the host project, right-click, and click Save Project for Reload.

    SPEL Offsite Host Rescoped Export Package 01

  5. On the Save Project for Reload dialog box, change the export location by clicking the Browse button .

    SPEL Save Project for Reload

  6. Click OK to export the re-scoped host project data as a package.

  7. Select the off-site plant and on the shortcut menu, click Load Standalone Project.

  8. On the following page of the Load Standalone Project Wizard, beside Zip file of plant, click the Browse button .

    SPEL Load Standalone Project DB 00

  9. Browse to the zip file containing the package with re-scoped data from the host that you want to load.

    SPEL Import to Host 02

  10. Click Next. The page shows you details of the package.

    SPEL Load Standalone Project DB 01

  11. Click Finish to load the package into the off-site plant.

    SPEL Load Standalone Project DB 02

    • The software loads the package into the reconciliation area only; data in the off-site project is unaffected.

    • Data loaded into the reconciliation area from a re-scoped package does not have any status assigned.