Transfer Data from the Off-Site Plant to the Host - Intergraph Smart Electrical - Help - Hexagon

Intergraph Smart Electrical Help

Language
English
Product
Intergraph Smart Electrical
Search by Category
Help
Smart Electrical Version
10

Before commencing this procedure, if you have created or modified metadata in the off-site plant, you must synchronize the metadata between the off-site plant and the host using the Reference Data Synchronization (RDS) Manager. Refer to the appropriate user's guides as follows:

  • For details of how to create or modify metadata, refer to the Smart Data Dictionary Manager help.

    You cannot make changes to the metadata in the plant breakdown structure table in the off-site plant. For example, do not add any user-defined fields in your plant breakdown structure. Doing so may damage the host project when you synchronize the metadata back to it.

  • For details of how to create an RDS package and synchronize the metadata between the off-site plant and the host, refer to the Introduction to Reference Data Synchronization Manager help.

  1. In Smart Electrical, open the off-site plant and select the project where you made changes to the data.

  2. Select the items that you want to merge back to the Reconciliation Area.

  3. Change the status of those items to Completed.

  4. Connect to the Reconciliation Area in the off-site plant and merge the items.

  5. Open Smart Engineering Manager and connect to the off-site plant.

  6. Select the off-site plant and on the shortcut menu, click Save Plant for Merge in Host.

    SPEL Offsite Save Plant for Merge in Host 01

  7. Click Next to accept the values on the Save Plant for Merge in Host dialog box.

    SPEL Offsite Save Plant for Merge in Host 02

    If you made revisions in the plant and you want to include those revisions in the package, select Include Smart Electrical revisions.

    The status bar at the bottom of the dialog box shows the current activity.

    SPEL Offsite Save Plant for Merge in Host 03

  8. Select the host project and on the shortcut menu, click Load Standalone Project.

    SPEL Import to Host 01

  9. On the following page of the Load Standalone Project Wizard, beside Zip file of plant, click the Browse button .

    SPEL Load Standalone Project DB 00

  10. Browse to the zip file containing the package from the off-site plant that you want to load.

    SPEL Import to Host 02

  11. Click Next. The page shows you details of the package.

    SPEL Load Standalone Project DB 01

  12. Click Finish to load the package into the host project.

    SPEL Load Standalone Project DB 02

  13. Open Smart Electrical and merge the updated project data back to the As-Built.