Automatic Switch-On of the Sizing Required Flag - Intergraph Smart Electrical - Help - Hexagon

Intergraph Smart Electrical Help

Language
English
Product
Intergraph Smart Electrical
Search by Category
Help
Smart Electrical Version
10

Changing one of the following properties automatically switches on (selects) the Sizing required check box on the General tab of the Cable Common Properties dialog.

Plant Cable Properties

(The properties of the power cable itself that needs to be resized)

The software automatically recalculates the voltage drop after you change one of the cable property values for a cable that has already been sized. If the value you enter exceeds the sizing parameters of the current cable, you will need to resize the cable by selecting the Calculate Sizing button on this tab. The software displays an appropriate message to this effect in the Calculation information box on this tab and turns on the Sizing required flag on the General tab of the Cable Common Properties dialog.

  • Actual / design / installed length

  • Number of phases

  • Rated voltage

  • Full load current (FLA)

  • Starting current

  • Power factor at full load

  • Power factor at starting

  • Allowable voltage drop at full load

  • Allowable voltage drop at starting

  • Include protection device

  • De-rating factor

  • Utilization factor

  • Code factor

  • Ambient temperature factor

Reference Cable Properties

(The properties of the reference cable associated with the plant power cable that needs to be resized)

  • Basic ampacity in air

  • Basic ampacity in ground

  • Custom basic ampacity

  • Reactance per unit length

  • Resistance per unit length

Load Properties

(The properties of the load connected to the plant power cable that needs to be resized)

  • Conformity to standard

  • Rated voltage

  • Number of phases

  • Supply (AC/DC)

  • Full load current (FLA)

  • Locked rotor current (for motors only)