Switch Active Operating Case Dialog - Intergraph Smart Electrical - Help - Hexagon

Intergraph Smart Electrical Help

Language
English
Product
Intergraph Smart Electrical
Search by Category
Help
Smart Electrical Version
10

Smart Electrical allows you to perform bus and PDB load summaries based on various sets of load values. These various sets of load data (referred here to as plant operating cases) provide the ability to analyze the total electrical load consumption of your plant based on different load properties and values. Typically, such operating cases are called Winter, Summer, and so on. However, you can create and define a number of such operating cases which cover your plant requirements.

Operating cases are defined in Options Manager. See Manage Operating Case Data for Plant Items.

This dialog enables you, in one single operation, to switch all the plant loads, instruments and cabinets to a plant operating case that you select.

Operating Case

Displays the name of the operating case. Select the option button to the left of the name to select it as the active case.

Description

Displays the description of the operating case.

Switch

Select to make the switch to the selected operating case.