Post-Upgrade Tasks - Intergraph Smart Electrical - 2019 (9.0) - Installation & Upgrade - Hexagon

Intergraph Smart Electrical Installation and Upgrade

Language
English
Product
Intergraph Smart Electrical
Search by Category
Installation & Upgrade
Smart Electrical Version
2019 (9.0)

After you complete all the upgrade tasks for a plant, make a full backup of the upgraded databases.

Some or all of the following post-upgrade tasks might also be required:

The requirement to upgrade SmartFrames applies if your plant was upgraded from 2014 R1 (or earlier). The Upgrade SmartFrames command is available in Smart Electrical 2019 HF16 and later and in Smart Electrical 10 HF5 and later. The instructions for enabling and executing Upgrade SmartFrames command display in the Upgrade SmartFrames Command - DM-PB-253661.pdf document in the Additional Files folder of the hot fix package.