Deleting Projects - Intergraph Smart Engineering Manager - 12 - Help - Hexagon

Intergraph Smart Engineering Manager Help

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Help
Smart Engineering Manager Version
12

Deleting a project removes the database tables and the associated user names for the various project and application schemas generated when the project was created.

  • Before you can access the Delete command from within a project, the project status must be marked as merged or canceled, and you must have full control permissions in Smart Engineering Manager.

  • Prior to deleting the project, all users must be logged out of all software components that use the project schemas. Smart Engineering Manager checks for open sessions of all database users before deleting the project.

  • The Delete command is not available for projects containing in-use satellite slots. All satellite slot connections must be disconnected before the project can be deleted.

  • The Delete command is not available if the project contains drawings at any plant group level. All drawings in the plant group level of the project must be deleted before the project can be deleted.

  • Deleting a project cannot be undone.

  • When deleting plant group levels, all drawings in the plant group level must be deleted before that level can be deleted. Furthermore, the Delete command is not available for a plant group level that is referenced (scoped) by another project.