New Unit Dialog - Intergraph Smart Engineering Manager - 12 - Help - Hexagon

Intergraph Smart Engineering Manager Help

Language
English
Product
Intergraph Smart Engineering Manager
Search by Category
Help
Smart Engineering Manager Version
12

Displays the New Unit dialog. An asterisk (*) at the end of an item name indicates a value is required for that item.

Name

Type a name for the unit as you want it to appear in the Tree view. A folder with this name cannot already exist in the plant structure folder. This field is limited to 240 characters and cannot contain any of the following characters: < > ? \ / ' ! % * | : "

Description

Type a description. The length of the description is limited to 240 characters.

Unit code

Type the unit code, which is used as an alphanumeric identification field in pipe run tags in all drawings created in the unit. The length of the unit code is limited to 40 characters. This limit is 3 characters if you plan to use the Piping Data Transfer to PDS 3D process.

Path

Displays the location where files in this unit are stored. The software automatically appends the value in the Name box to this path and creates a folder using this name in your plant storage location. This field is limited to 255 characters.

  • The Path field cannot contain any spaces if you plan to use the Piping Data Transfer to PDS 3D process.

  • In a Workshare collaboration, new units cannot be created by standalone satellite sites or by the satellite sites in a project.