Introduction to Intergraph Smart® Engineering Manager Upgrade Utility - Intergraph Smart Engineering Manager - 12 - Installation & Upgrade - Intergraph

Intergraph Smart Engineering Manager Upgrade Utility Help

ft:locale
en-US
Product
Intergraph Smart Engineering Manager
Search by Category
Installation & Upgrade
Smart Engineering Manager Version
12

This guide explains how to use the features of the Intergraph Smart® Engineering Manager Upgrade Utility. For full details of the upgrade process, including prerequisite activities and post-upgrade tasks, see the Smart Engineering Manager Installation and Upgrade Guide.

Before using the new version of the software, we strongly recommend that you completely upgrade your plant and applications as described in this section. For Smart P&ID, you should update all drawings to the current version. A plant with a mixture of upgraded and non-upgraded data may result in some data being permanently inaccessible.

  • You use the Smart Engineering Manager Upgrade Utility to upgrade the plant and application databases to the latest version of the software.

Upgrading Plants and Applications Containing Projects

Running the Upgrade Utility on a plant and applications containing projects upgrades the relevant project schemas at the same time.  Each of the upgrade tasks handles any necessary changes in both the plant or application databases and the project databases.

Upgrading Satellites in a Workshare Collaboration

You do not have to collapse or shut down projects or satellites in Workshare collaborations before upgrading.  Upgrading a satellite is a separate process.  The host for a connected satellite must be upgraded before the satellite.

Customer Support
Hexagon Policy Against Software Piracy
Copyright 2002-2025 Hexagon AB and/or its subsidiaries and affiliates
Version 12
Published 2/19/2025 at 12:14 PM