  1. Press F7 to open the Domain Explorer, and expand the hierarchy to the hook-up type level in the Hook-Ups folder.

  2. In the tree view pane, select the Hook-Ups folder to display all the existing hook-up types and hook-ups, and right-click one or more hook-up types or hook-ups.

  3. On the shortcut menu, select Actions > Hook-Up Drawing List.

  4. On the Hook-Up Drawing List dialog, select a required row and select Revisions.

  5. On the Revisions dialog, select one of the revision numbering methods (use P0, P1, P2... for preliminary revisions or 0, 1, 2 / A, B, C, and so forth, for normal serial revisions).

    SHARED Tip When you first select a revision numbering method, several options are available to you, including preliminary revisions (designated by P0, P1, P2). After you select one of the other revision methods, you will not be able to return to the preliminary revision method and this option will be disabled.

  6. Do one of the following:

    • Select a field of an existing row to update the existing revision data.

    • Select New to add new revision data, and then type new revision data values.

    SHARED Tip As a time saver and a forget-me-not precaution, take advantage of using a default revision method.

    The software automatically adds a new line with the next logical character and date each time you select New after you select the initial method.

  7. If necessary, select Delete to delete any previous revisions that are no longer needed.

SHARED Tip You can also maintain revisions in batch mode using global revisions. For more information, see Global Revisions.