This project default determines whether data for group, part, commodity code, and ident is filtered based on different discipline selections. This filtering applies to E&PI (BOM) and E&PI(Req). In previous Smart Materials versions, this project default was called ZB_QRY_DP.
The possible values are 1 (default), 2, 3, or 4.
If the value is set to 1, all data (regardless of discipline) is allowed.
If the value is set to 2, data corresponding to the login and queryable discipline is allowed (Display check box on A.20.06.03).
If the value is set to 3, only the data corresponding to the login discipline is allowed.
If the value is set to 4, data corresponding to the login and discipline scope is allowed (Discipline Scope check box on A.20.06.03).
You must re-log in and set the project and discipline in order to activate changes in this project default.
-
Module(s) affected by this setting: AS1002, B2001, B2002, B2003, E1002, R3001
-
Default value: 1
-