ZP_MG_QUAL - Intergraph Smart Materials - Version 10.2 - Administration & Configuration - Hexagon

Intergraph Smart Materials Classic Administration (10.2)

Language
English
Product
Intergraph Smart Materials
Subproduct
Classic
Search by Category
Administration & Configuration
Smart Materials/Smart Reference Data Version
10.2

This project default specifies the material groups to be automatically marked as being qualified.

With this project default, you control the default settings for some fields on the Material/Work Groups tab on P.20.01 Suppliers/Subcontractors.

This project default is not considered for materials and services entered and submitted via Portal, these are always set to Hold in the Classification cell, and the Qualified check box and Qualified Date are not set.

If this project default has been set to N (default), new material/work groups are not marked as being qualified, the classification is set to Not qualified, and the date of qualification is not set.

If the project default is set to Y, new material/work groups are marked as being qualified. The classification is set to Qualified, and the date of the qualification is set to the current date.

  • Module(s) affected by this setting: P2001

  • Default value: N

  • List of Values: N/Y