This project default specifies whether to add the manual line item quantity to the MTO line item quantity (with the next MTO run).
-
Module(s) affected by this setting: Requisitions > Material Take Off Jobs, Requisitions > Setup > Nodes and Templates.
-
List of Values: Y and N (default).
-
If set to Y, check box is checked and in the next MTO run, the software tries to integrate a manual line item into an MTO line item. This happens only, if the manual line item data exists on the BOM.
-
If set to N, check box is not checked and no manual item get integrated.
-