Schedule Update Command - Intergraph Smart P&ID - 11 - Help - Hexagon

Intergraph Smart P&ID Drawing Manager

Language
English
Product
Intergraph Smart P&ID
Subproduct
Drawing Manager
Search by Category
Help
Smart P&ID Version
11

Displays the Schedule Task Wizard. Use this wizard to schedule the update operations for any out-of-date drawings. For information about using this wizard, refer to Schedule Task Wizard.

  • In order to use this command, you must be assigned the user right Update P&ID on the Role Properties dialog in Smart Engineering Manager. Also, you are required to have Full Control assigned on P&ID Objects.

  • If you are logged in as a standard user on a Windows 10 operating system, your System Administrator must assign you special user rights to be able to run scheduled tasks. For details, see Assign User Rights for Scheduled Tasks on Windows 10.

  • Any changes made to the out-of-date drawing settings after the task is scheduled will not affect the scheduled task.

  • If update drawings processing is scheduled for a hierarchy item, select in the Tree view, at the scheduled time all the drawings under it are analyzed and only the out-of-date drawings are updated.

  • If update drawings processing is scheduled for drawings, selected in the List view, at the scheduled time only the selected drawings are analyzed and the out-of-date drawings are updated.

  • Drawings with missing symbols are logged but not updated. Drawings that do not require an update are logged with a message that the drawing is up-to-date.