Set Stockpile Location of Partner OPC Dialog - Intergraph Smart P&ID - 10 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
10
Smart Engineering Manager Version
11
SmartSketch Version
10.0(2018)

Opens after you place a connector on a drawing, unless you have selected the Place Partner OPC in Stockpile option on the Placement tab of the Options dialog. The Set Stockpile Location of Partner OPC dialog allows you to select the drawing stockpile and also the stockpile into which the partner of the new connector is placed.

Plant Hierarchy

Displays the hierarchical tree representation of the plant. When you select a node, the drawings associated with that node appear in the Drawing list area.

Drawing list

Displays all the drawings associated with the selected node on the Plant Hierarchy tree. Choose a stockpile from this view to associate the partner connector with.