Batch Copy Item Properties Using Plant Editing - Intergraph Smart P&ID - 10 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
10
Smart Engineering Manager Version
11
SmartSketch Version
10.0(2018)

This option applies where the cell contents are compatible.

  1. On the Engineering Data Editor toolbar, choose an item type from the select list, for example, Pipe Run.

  2. Select the scope for the display of the data (Active Drawing, Other Drawings, stockpiles).

  3. If needed, apply a filter to display only the data rows where you want to copy data.

  4. Right-click in the field from which you want to copy data and select Copy on the shortcut menu.

  5. Select the field to which you want to copy data, or hold down SHIFT while selecting several consecutive fields in a column.

  6. Right-click, and select Paste on the shortcut menu.

  • If you use Plant Editing to change a property value in a non-active drawing, propagation occurs according to the System Editing rules defined for the plant and the Engineering Data Editor display is automatically updated. This includes propagation of data between non-active drawings across Off-Page Connectors (OPCs) when both drawings involved are not opened by a user. Propagation does not occur across OPCs between the active drawing and a non-active drawing.

  • If a property value in the Engineering Data Editor is changed by the user or as a result of an automatic update and this property is used for sorting, the software does not update the sort order of the data automatically if the values are no longer in the correct order.