Scenario 1 - Intergraph Smart P&ID - 11 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
11
Smart Engineering Manager Version
12
SmartSketch Version
11

In this scenario, you will run tasks from the To Do List to do the following:

  • Create pump assembly P-101A (sent to the Active Drawing Stockpile)

  • Create pump assembly P-101B (sent to the Active Drawing Stockpile)

  • Create pipe run DEAFeed (placed in the Design Window)

  • Create pipe run GS9 (placed in the Design Window)

  1. Display the To Do List dialog for imported ABE data (equipment and streams):

  2. Assign a pump assembly to an equipment Create task.

    This action automatically assigns the assembly to other related equipment Create tasks, including any subsequent Create tasks for the same related equipment generated as a result of changes in the ABE data later on.

  3. Assign a pipe run symbol to each individual pipe run Create task.

  4. From the To Do List toolbar, press the Create in Drawing PPM All Outputs Graphic command button to place items in the drawing when the Create tasks are run.

    Equipment with an assigned assembly is placed in the Active Drawing Stockpile by default, regardless of this setting; therefore, only the pipe runs will be placed in the drawing when you run the Create tasks.

  5. Select the four tasks in the list and select the Run PPM All Outputs Graphic command.

  6. From the EDE item list, select Equipment: Mechanical.

    The 2 pump assemblies appear in the Active Drawing Stockpile and the 2 pipe runs appear in the active drawing.

  7. Select one of the assemblies in the EDE and drag it to the Design Window to the position where you want to place it.

  8. Click to place the assembly.

    On completion of placement of the first assembly, you are prompted to placed the second assembly.

  9. Move the cursor the position where you want to place the assembly and click to place it.

    In this example, P-101B was selected for placement before P-101A. After the first assembly is placed, the remaining items are selected for placement in alphabetical order.

  10. Select the main item of each assembly to view its properties.

  11. Select each pipe run in turn to view its properties.