Assign Drawing Dialog - Intergraph Smart P&ID - 11 - Help - Intergraph

Intergraph Smart P&ID Help

Language
English
Product
Intergraph Smart P&ID
Search by Category
Help
Smart P&ID Version
11
Smart Engineering Manager Version
12
SmartSketch Version
11

Allows you to associate a task in the To Do List with a drawing assigned to the active plant structure. Create tasks are not initially associated with a drawing; you can assign Create or Manual tasks using this dialog. This dialog opens when you select Assign Drawing PPM All Outputs Graphic on the To Do List dialog.

Clear

Removes the association between the selected task and a drawing.

Drawings

Lists all the drawings associated with the active plant. Select the drawing that you want to associate with the tasks you selected on the To Do List dialog. When you select a drawing and select OK, the selected tasks are assigned to that drawing.