Blasting type comes from the Quotation/Order item for Pre-blasting or Blasting. The blasting work load is measured in time. Cost calculation in the Sales application uses part or material weight.
Time calculation for Plate Part after cutting:
Work Time = |
Blasting Base Time (C) |
Cost weight calculation for Plate Part after cutting:
Cost Weight = |
Part Net Weight |
Time calculation for Plate Material:
Work Time = |
Blasting Base Time (C) |
Cost weight calculation for Plate Material:
Cost Weight = |
Profile material article weight |
Time calculation for Profile Part after sawing:
Work Time = |
Blasting Base Time (C) |
Cost weight calculation for Profile Part after sawing:
Cost Weight = |
Part Net Weight |
Time calculation for Profile Material:
Work Time = |
Blasting Base Time (C) |
Cost weight calculation for Profile Material:
Cost Weight = |
Profile material article weight |